Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
SPA.PBN.105 PBN operational approval
Available versions for ERULES-1963177438-13011
Regulation (EU) 2016/1199
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
SPA.PBN.105 PBN operational approval Regulation (EU) 2016/1199 To obtain a PBN specific approval from the competent authority, the operator shall provide evidence that: (a) the relevant airworthiness approval, suitable for the intended PBN operation, is stated in the AFM or other document that has been approved by the certifying authority as part of an airworthiness assessment or is based on such approval; (b) a training programme for the flight crew members and relevant personnel involved in the flight preparation has been established; (c) a safety assessment has been carried out; (d) operating procedures have been established specifying: (1) the equipment to be carried, including its operating limitations and appropriate entries in the minimum equipment list (MEL); (2) flight crew composition, qualification and experience; (3) normal, abnormal and contingency procedures; and (4) electronic navigation data management; (e) a list of reportable events has been specified; and (f) a management RNP monitoring programme has been established for RNP AR APCH operations, if applicable.
SPA.PBN.105 PBN operational approval Regulation (EU) 2016/1199 To obtain a PBN specific approval from the competent authority, the operator shall provide evidence that: (a) the relevant airworthiness approval, suitable for the intended PBN operation, is stated in the AFM or other document that has been approved by the certifying authority as part of an airworthiness assessment or is based on such approval; (b) a training programme for the flight crew members and relevant personnel involved in the flight preparation has been established; (c) a safety assessment has been carried out; (d) operating procedures have been established specifying: (1) the equipment to be carried, including its operating limitations and appropriate entries in the minimum equipment list (MEL); (2) flight crew composition, qualification and experience; (3) normal, abnormal and contingency procedures; and (4) electronic navigation data management; (e) a list of reportable events has been specified; and (f) a management RNP monitoring programme has been established for RNP AR APCH operations, if applicable.
#### SPA.PBN.105 PBN operational approval *Regulation (EU) 2016/1199* To obtain a PBN specific approval from the competent authority, the operator shall provide evidence that: (a) the relevant airworthiness approval, suitable for the intended PBN operation, is stated in the AFM or other document that has been approved by the certifying authority as part of an airworthiness assessment or is based on such approval; (b) a training programme for the flight crew members and relevant personnel involved in the flight preparation has been established; (c) a safety assessment has been carried out; (d) operating procedures have been established specifying: (1) the equipment to be carried, including its operating limitations and appropriate entries in the minimum equipment list (MEL); (2) flight crew composition, qualification and experience; (3) normal, abnormal and contingency procedures; and (4) electronic navigation data management; (e) a list of reportable events has been specified; and (f) a management RNP monitoring programme has been established for RNP AR APCH operations, if applicable.