Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
CAT.POL.H.210 Take-off flight path
Available versions for ERULES-1963177438-12801
Regulation (EU) No 965/2012
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Feb 2025)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
CAT.POL.H.210 Take-off flight path Regulation (EU) No 965/2012 (a) From the end of the TODRH with the critical engine failure recognised at the TDP: (1) The take-off mass shall be such that the take-off flight path provides a vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR and 10,7 m (35 ft) + 0,01 × distance DR for operations under IFR. Only obstacles as specified in [CAT.POL.H.110](#_DxCrossRefBm927678855) have to be considered. (2) Where a change of direction of more than 15° is made, adequate allowance shall be made for the effect of bank angle on the ability to comply with the obstacle clearance requirements. This turn is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved procedure in the AFM. (b) When showing compliance with (a), account shall be taken of the appropriate parameters of [CAT.POL.H.105](#_DxCrossRefBm927678853)(c) at the aerodrome or operating site of departure.
CAT.POL.H.210 Take-off flight path Regulation (EU) No 965/2012 (a) From the end of the TODRH with the critical engine failure recognised at the TDP: (1) The take-off mass shall be such that the take-off flight path provides a vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR and 10,7 m (35 ft) + 0,01 × distance DR for operations under IFR. Only obstacles as specified in [CAT.POL.H.110](#_DxCrossRefBm318086475) have to be considered. (2) Where a change of direction of more than 15° is made, adequate allowance shall be made for the effect of bank angle on the ability to comply with the obstacle clearance requirements. This turn is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved procedure in the AFM. (b) When showing compliance with (a), account shall be taken of the appropriate parameters of [CAT.POL.H.105](#_DxCrossRefBm318086473)(c) at the aerodrome or operating site of departure.
#### CAT.POL.H.210 Take-off flight path *Regulation (EU) No 965/2012* (a) From the end of the TODRH with the critical engine failure recognised at the TDP: (1) The take-off mass shall be such that the take-off flight path provides a vertical clearance, above all obstacles located in the climb path, of not less than 10,7 m (35 ft) for operations under VFR and 10,7 m (35 ft) + 0,01 × distance DR for operations under IFR. Only obstacles as specified in [CAT.POL.H.110](#_DxCrossRefBm523088411) have to be considered. (2) Where a change of direction of more than 15° is made, adequate allowance shall be made for the effect of bank angle on the ability to comply with the obstacle clearance requirements. This turn is not to be initiated before reaching a height of 61 m (200 ft) above the take-off surface unless it is part of an approved procedure in the AFM. (b) When showing compliance with (a), account shall be taken of the appropriate parameters of [CAT.POL.H.105](#_DxCrossRefBm523088409)(c) at the aerodrome or operating site of departure.