Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC2 ORO.FTL.120(b)(4) Fatigue risk management (FRM)
Available versions for ERULES-1963177438-12041
ED Decision 2014/017/R
found in: Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
From
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
From section
To
Air Operations Rev... (Mar 2026)
Air Operations (96... (Feb 2025)
Air Operations (96... (Sep 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC2 ORO.FTL.120(b)(4) Fatigue risk management (FRM) ED Decision 2014/017/R CAT OPERATORS RISK ASSESSMENT An operator should develop and implement risk assessment procedures that determine the probability and potential severity of fatigue-related events and identify when the associated risks require mitigation. The risk assessment procedures should review identified hazards and link them to: (a) operational processes; (b) their probability; (c) possible consequences; and (d) the effectiveness of existing safety barriers and controls.
AMC2 ORO.FTL.120(b)(4) Fatigue risk management (FRM) ED Decision 2014/017/R CAT OPERATORS RISK ASSESSMENT An operator should develop and implement risk assessment procedures that determine the probability and potential severity of fatigue-related events and identify when the associated risks require mitigation. The risk assessment procedures should review identified hazards and link them to: (a) operational processes; (b) their probability; (c) possible consequences; and (d) the effectiveness of existing safety barriers and controls.
##### AMC2 ORO.FTL.120(b)(4) Fatigue risk management (FRM) *ED Decision 2014/017/R* **CAT OPERATORS RISK ASSESSMENT** An operator should develop and implement risk assessment procedures that determine the probability and potential severity of fatigue-related events and identify when the associated risks require mitigation. The risk assessment procedures should review identified hazards and link them to: (a) operational processes; (b) their probability; (c) possible consequences; and (d) the effectiveness of existing safety barriers and controls.