Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
GM1 145.A.42(b)(ii) Components
Available versions for ERULES-1963177438-11593
ED Decision 2021/009/R
found in: Continuing Airworthiness (1321/2014) Part-M Part-145 Part-66 Part-147 Part-T Part-ML Part-CAMO Part-CAO (Jul 2024)
From
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
From section
To
Continuing Airwort... (Sep 2025)
Continuing Airwort... (Jul 2024)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
GM1 145.A.42(b)(ii) Components ED Decision 2021/009/R INSTALLATION OF COMPONENTS Components, standard parts and materials should only be installed when they are specified in the applicable maintenance data as specified in [145.A.45(b)](#_DxCrossRefBm1518545005). So, the installation of a component, standard part or material can only be done after checking the applicable maintenance data. This check should ensure that the part number, modification status, limitations, etc., of the component, standard part or material are the ones specified in the applicable maintenance data of the particular aircraft or component where the component, standard part or material is going to be installed. The organisation should establish procedures to ensure that this check is performed before installation.
##### GM1 145.A.42(b)(ii) Components *ED Decision 2021/009/R* **INSTALLATION OF COMPONENTS** Components, standard parts and materials should only be installed when they are specified in the applicable maintenance data as specified in [145.A.45(b)](#_DxCrossRefBm1203439892). So, the installation of a component, standard part or material can only be done after checking the applicable maintenance data. This check should ensure that the part number, modification status, limitations, etc., of the component, standard part or material are the ones specified in the applicable maintenance data of the particular aircraft or component where the component, standard part or material is going to be installed. The organisation should establish procedures to ensure that this check is performed before installation.