Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC3 ORA.FSTD.100 General
Available versions for ERULES-1963177438-11021
ED Decision 2012/007/R
found in: Aircrew (1178/2011) Part-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTO (Dec 2024)
From
Aircrew (1178/2011... (Nov 2025)
Aircrew (1178/2011... (Dec 2024)
Aircrew (1178/2011... (Aug 2023)
From section
To
Aircrew (1178/2011... (Nov 2025)
Aircrew (1178/2011... (Dec 2024)
Aircrew (1178/2011... (Aug 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC3 ORA.FSTD.100 General ED Decision 2012/007/R COMPLIANCE MONITORING PROGRAMME – ORGANISATIONS OPERATING BASIC INSTRUMENT TRAINING DEVICES (BITDs) (a) The compliance monitoring programme together with a statement acknowledging completion of a periodic review by the accountable manager should include the following: (1) a maintenance facility that provides suitable BITD hardware and software test and maintenance capability; (2) a recording system in the form of a technical log in which defects, deferred defects and development work are listed, interpreted, actioned and reviewed within a specified time scale; and (3) planned routine maintenance of the BITD and periodic running of the qualification test guide (QTG) with adequate manning to cover BITD operating periods and routine maintenance work. (b) A planned audit schedule and a periodic review should be used to verify that corrective action was carried out and that it was effective. The auditor should have adequate knowledge of BITDs.
AMC3 ORA.FSTD.100 General ED Decision 2012/007/R COMPLIANCE MONITORING PROGRAMME – ORGANISATIONS OPERATING BASIC INSTRUMENT TRAINING DEVICES (BITDs) (a) The compliance monitoring programme together with a statement acknowledging completion of a periodic review by the accountable manager should include the following: (1) a maintenance facility that provides suitable BITD hardware and software test and maintenance capability; (2) a recording system in the form of a technical log in which defects, deferred defects and development work are listed, interpreted, actioned and reviewed within a specified time scale; and (3) planned routine maintenance of the BITD and periodic running of the qualification test guide (QTG) with adequate manning to cover BITD operating periods and routine maintenance work. (b) A planned audit schedule and a periodic review should be used to verify that corrective action was carried out and that it was effective. The auditor should have adequate knowledge of BITDs.
##### AMC3 ORA.FSTD.100 General *ED Decision 2012/007/R* **COMPLIANCE MONITORING PROGRAMME – ORGANISATIONS OPERATING BASIC INSTRUMENT TRAINING DEVICES (BITDs)** (a) The compliance monitoring programme together with a statement acknowledging completion of a periodic review by the accountable manager should include the following: (1) a maintenance facility that provides suitable BITD hardware and software test and maintenance capability; (2) a recording system in the form of a technical log in which defects, deferred defects and development work are listed, interpreted, actioned and reviewed within a specified time scale; and (3) planned routine maintenance of the BITD and periodic running of the qualification test guide (QTG) with adequate manning to cover BITD operating periods and routine maintenance work. (b) A planned audit schedule and a periodic review should be used to verify that corrective action was carried out and that it was effective. The auditor should have adequate knowledge of BITDs.