Light
Dark
System
Log In
Loading...
Compare / EASA/
Incorporated Amendments
/
Compare & Highlight Differences
AMC1 ARA.GEN.305(f) Oversight programme
Available versions for ERULES-1963177438-10978
ED Decision 2018/009/R
found in: Aircrew (1178/2011) Part-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTO (Dec 2024)
From
Aircrew (1178/2011... (Nov 2025)
Aircrew (1178/2011... (Dec 2024)
Aircrew (1178/2011... (Aug 2023)
From section
To
Aircrew (1178/2011... (Nov 2025)
Aircrew (1178/2011... (Dec 2024)
Aircrew (1178/2011... (Aug 2023)
To section
No visible text changes
0 removals
0 additions
View
Rich
Plain
Sync scrolling
Share
From
Show details
Hide details
To
Show details
Hide details
Version
Show side by side
AMC1 ARA.GEN.305(f) Oversight programme ED Decision 2018/009/R (a) When determining the oversight programme for organisations that have declared their activities, the competent authority should make a selection of the DTOs to be inspected based on the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm894736073). (b) For each selected DTO, an inspection is a sample inspection of the predefined inspection criteria on the basis of key risk elements and the applicable requirements. (c) The results of past oversight activities should include information from the DTO’s annual internal review and the DTO’s annual activity reports as well as information from the verification of the DTO’s training programme for Part-FCL compliance and occurrence reports linked to the activity of the DTO, if applicable. (d) The oversight programme should follow a risk-based approach and should be developed on a yearly basis. At least one inspection should be performed for each DTO not later than 72 months starting from the date on which the declaration was received or, subsequently, the last inspection, as applicable. (e) Additional inspections or unannounced inspections to specific DTOs may be included in the oversight programme on the basis of the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm894736073).
AMC1 ARA.GEN.305(f) Oversight programme ED Decision 2018/009/R (a) When determining the oversight programme for organisations that have declared their activities, the competent authority should make a selection of the DTOs to be inspected based on the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm1199963929). (b) For each selected DTO, an inspection is a sample inspection of the predefined inspection criteria on the basis of key risk elements and the applicable requirements. (c) The results of past oversight activities should include information from the DTO’s annual internal review and the DTO’s annual activity reports as well as information from the verification of the DTO’s training programme for Part-FCL compliance and occurrence reports linked to the activity of the DTO, if applicable. (d) The oversight programme should follow a risk-based approach and should be developed on a yearly basis. At least one inspection should be performed for each DTO not later than 72 months starting from the date on which the declaration was received or, subsequently, the last inspection, as applicable. (e) Additional inspections or unannounced inspections to specific DTOs may be included in the oversight programme on the basis of the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm1199963929).
##### AMC1 ARA.GEN.305(f) Oversight programme *ED Decision 2018/009/R* (a) When determining the oversight programme for organisations that have declared their activities, the competent authority should make a selection of the DTOs to be inspected based on the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm1743303739). (b) For each selected DTO, an inspection is a sample inspection of the predefined inspection criteria on the basis of key risk elements and the applicable requirements. (c) The results of past oversight activities should include information from the DTO’s annual internal review and the DTO’s annual activity reports as well as information from the verification of the DTO’s training programme for Part-FCL compliance and occurrence reports linked to the activity of the DTO, if applicable. (d) The oversight programme should follow a risk-based approach and should be developed on a yearly basis. At least one inspection should be performed for each DTO not later than 72 months starting from the date on which the declaration was received or, subsequently, the last inspection, as applicable. (e) Additional inspections or unannounced inspections to specific DTOs may be included in the oversight programme on the basis of the elements specified in point [ARA.GEN.305(f)](#_DxCrossRefBm1743303739).