Navigate / EASA

AMC1 Article 6(8) UAS operators

ED Decision 2022/022/R

CONTINGENCY MEASURES AND PROCEDURES

UAS operators should describe their contingency measures and procedures within the contractual agreement with the USSPs.

In addition, UAS operators should detail for each flight in their flight authorisation requests the planned contingency measures (e.g. alternative routes, emergency landing sites).