AMC1 Article 6(5) UAS
operators
ED Decision
2022/022/R
The UAS operator should activate the UAS flight authorisation before the take-off, and end it as soon as possible after landing.
In case of operations that involve multiple take-offs and landings, the UAS flight authorisation should be activated once before the first take-off, and should be ended only after the last landing.
Loading collections...