Navigate / EASA

Article 3 — Assistance by the Performance Review Body

Regulation (EU) 2019/317

Where necessary for carrying out the tasks of the Commission related to the detailed functioning of the performance scheme, the Commission may request assistance from the Performance Review Body as regards the following:

(a)     the collection, examination, validation and dissemination of relevant data for the performance of air navigation services and network functions;

(b)     the selection or adaptation of key performance areas;

(c)      the definition of key performance indicators and indicators for monitoring;

(d)     the setting of Union-wide performance target ranges, and the setting and the revision of Union-wide performance targets;

(e)     the establishment of the baseline values, alert thresholds, and comparator groups referred to in Article 9(4);

(f)      the assessment of the consistency of draft national performance targets or performance targets set at the level of functional airspace blocks (‘FAB performance targets’) with the Union-wide performance targets in accordance with Article 14 and Article 15 and the review of draft performance plans in accordance with Article 14(1) and Article 15(1);

(g)     the verification of the completeness of the draft performance plans in accordance with Article 13;

(h)     the verification, in accordance with Article 19, of the draft Network Performance Plan as referred in Article 10(5) of this Regulation;

(i)      the assessment of revised performance targets and of the corrective measures adopted by Member States pursuant to Article 15(5);

(j)      the monitoring of the performance of air navigation services, including investment and capital expenditure, at Union level, at national level and at the level of functional airspace blocks;

(k)     the monitoring of the performance of the network functions in accordance with Article 37(2);

(l)      the assessment, in accordance with Article 37(3), of the information received from the national supervisory authorities in relation to the performance plans, for the purpose of monitoring the performance of the European ATM network;

(m)    the assessment of the achievement of the performance targets during the reference period;

(n)     the maintenance and support in the coordination of a stakeholder consultation calendar concerning performance plans and the consultation requirements referred to in Article 24(2) and (3) and in Article 30.