Light
Dark
System
Log In
Loading...
ToC
Table of Contents
Tables
List of Tables
Images
List of Images
Amdts
Incorporated Amendments
CS
List of CS
Parts
Parts
Domains
Domains
Regulations
Regulations
Standards
Standards
Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Dec 2024)
Aerodromes (139/2014) Part-ADR.AR Part-ADR.OR Part-ADR.OPS CS-ADR-DSN CS-HPT-DSN (Jun 2023)
Aircrew (1178/2011) Part-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTO (Dec 2024)
Aircrew (1178/2011) Part-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTO (Aug 2023)
Aircrew (1178/2011) Part-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTOPart-FCL Part-MED Part-CC Part-ARA Part-ORA Part-DTO (Nov 2025)
Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Feb 2025)
Air Operations (965/2012) Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Sep 2023)
Air Operations Revision 24 Part-ARO Part-ORO Part-CAT Part-SPA Part-NCC Part-NCO Part-SPO (Mar 2026)
Air Traffic Controllers Licensing and Certification (2015/340) Part-ATCO (Jun 2024)
AMC-20 Amdt 21 - Airworthiness of Products, Parts and Appliances (Apr 2021)
AMC-20 Amdt 22 - Airworthiness of Products, Parts and Appliances (May 2021)
AMC-20 Amdt 23 - Airworthiness of Products, Parts and Appliances (Jan 2022)
ATM/ANS Equipment (2023/1769 and 2023/1768) Part-DPO Part-ATM/ANS.EQMT (Nov 2024)
ATM/ANS Provision of Services (2017/373) (Mar 2025)
ATM/ANS Provision of Services (2017/373) (Feb 2023)
Balloon Rule Book - Part-BOP Part-BFCL Part-ML CS-31GB CS-31HB CS-31TGB (Sep 2020)
Basic Regulation EU 2018/1139 (Jan 2023)
Continuing Airworthiness (Sep 2025)
Continuing Airworthiness (1321/2014) Part-M Part-145 Part-66 Part-147 Part-T Part-ML Part-CAMO Part-CAO (Jul 2024)
CS-22 Amdt 2 - Sailplanes and Powered Sailplanes (Feb 2022)
CS-23 Amdt 5 AMC-GM Issue 3 - Normal-Category Aeroplanes (Jul 2020)
CS-23 Amdt 6 AMC-GM Issue 4 - Normal-Category Aeroplanes (Mar 2023)
CS-23 Amdt 6 AMC-GM Issue 5 - Normal-Category Aeroplanes (May 2026)
CS-25 Amdt 27 - Large Aeroplanes (Jan 2023)
CS-26 Additional Airworthiness Specifications for Operations (No 2015/640) Part-26 (Mar 2023)
CS-26 Additional Airworthiness Specifications for Operations (Part-26) (Oct 2025)
CS-27 Amdt 10 - Small Rotorcraft (Feb 2023)
CS-27 Amdt 9 - Small Rotorcraft (Dec 2021)
CS-29 Amdt 10 - Large Rotercraft (Jan 2023)
CS-29 Amdt 11 - Large Rotercraft (Feb 2023)
CS-29 Amdt 12 - Large Rotorcraft (Mar 2026)
CS-31GB Initial issue - Free Gas Balloons (Dec 2011)
CS-31HB Amdt 1 - Hot Air Balloons (Dec 2011)
CS-31TGB Initial issue - Tethered Gas Balloons (Jul 2013)
CS-ACNS Issue 4 - Airborne Communications, Navigation and Surveillance (Jun 2022)
CS-CCD Issue 2 - Cabin Crew Data (Oct 2020)
CS-E Amdt 5 - Engines (Dec 2018)
CS-FCD Issue 2 - Flight Crew Data (Jun 2023)
CS-FSTD(A) Issue 2 - Aeroplane Flight Simulation Training Devices (May 2018)
CS-FSTD(H) Initial issue - Helicopter Flight Simulation Training Devices (Jun 2012)
CS-GEN-MMEL Issue 2 - Generic Master Minimum Equipment List (May 2024)
CS-LSA Amdt 1 - Light Sport Aeroplanes (Nov 2018)
CS-MMEL Issue 2 - Master Minimum Equipment List (Aug 2020)
CS-MMEL Issue 3 - Master Minimum Equipment List (May 2021)
CS-SIMD Initial issue - Simulator Data (Dec 2014)
CS-VLA Amdt 1 - Very Light Aeroplanes (Mar 2009)
Easy Access Rules for Aerodromes (Mar 2026)
GM Remote Aerodrome Air Traffic Services (Jan 2026)
GM Remote Aerodrome Air Traffic Services (ED 2019/004/R) Issue 2 (Jul 2020)
Ground Handling (GH) (2025/23 and 2025/20) (Nov 2025)
Information Security (2023/203 and 2022/1645) Part-IS (Dec 2025)
Information Security (2023/203 and 2022/1645) Part-IS (Jun 2024)
Initial Airworthiness and Environmental Protection (748/2012) (Nov 2025)
Initial Airworthiness and Environmental Protection (748/2012) Part-21 Part-21L (Jul 2024)
Occurrence Reporting (376/2014) (Dec 2022)
Sailplane Rule Book - Part-SAO Part-SFCL CS-22 (Nov 2022)
SERA (923/2012) Standardised European Rules of the Air (Dec 2024)
SERA (923/2012) Standardised European Rules of the Air (Feb 2023)
SERA - Standardised European Rules of the Air (Aug 2025)
SKPI (2019/317) Safety Key Performance Indicators (Dec 2020)
Small Category VCA (Revision 0) SC-VTOL (Oct 2024)
Third Country Operators (Jul 2026)
Third Country Operators (452/2014) Part-TCO Part-ART (Apr 2023)
Unmanned Aircraft Systems (Jun 2026)
Unmanned Aircraft Systems (2019/947 and 2019/945) Part-UAS (Jul 2024)
U-space (2021/664) (May 2024)
Table of contents
Share
Browse all sections of SKPI (2019/317) Safety Key Performance Indicators (Dec 2020)
GM1 SKPI -- General
CHAPTER VI — CALCULATION OF UNIT RATES AND CHARGES
AMC3 Safety performance indicators (SPIs) for the monitoring of separation minima infringements (SMIs) and runway incursions (RIs)
Article 38 -- Publication
6. References
Article 4 -- National supervisory authorities
Article 9 -- Union-wide performance targets
Article 21 -- Establishment of charging zones
AMC5 Safety performance indicator (SPI) for monitoring ATFM over-deliveries
CHAPTER II — TASKS AND RESPONSIBILITIES
Article 3 -- Assistance by the Performance Review Body
Article 9 -- Sanctions
Article 17 -- Performance targets or corrective measures adopted after the start of the reference period
Article 7 -- Relations with European third countries
Article 36 -- Provision of information
Article 20 -- Principles for the financing of air navigation services
Disclaimer
ANNEX XI -- REPORTING TABLES TO SUPPORT THE COST BASE AND UNIT RATES TO BE PROVIDED TO THE COMMISSION IN ACCORDANCE WITH ARTICLE 35(6)
STATEMENT BY THE MEMBER STATES ON MILITARY ISSUES RELATED TO THE SINGLE EUROPEAN SKY
ANNEX III -- TEMPLATE FOR THE NETWORK PERFORMANCE PLAN REFERRED TO IN ARTICLE 10(5)
ANNEX V -- CRITERIA FOR THE ASSESSMENT OF THE DRAFT NETWORK PERFORMANCE PLAN
GM4 SKPI Measurement of the effectiveness of safety management (EoSM) KPI -- ANSP level -- Verification mechanism
GM6 Safety performance indicator (SPI) on automated safety data recording systems
ANNEX IX -- UNIT RATES
Article 28 -- Cost risk sharing mechanism
Article 39 -- Reasoning and appeal of national decisions
Article 3 -- Fields for action by the Community
5.Proposed actions to support implementation
EASA RP3 Safety – Supporting Material
ANNEX I -- KEY PERFORMANCE INDICATORS (KPI) FOR TARGET SETTING AND INDICATORS FOR MONITORING
Article 24 -- Transparency of costs
ANNEX X -- CRITERIA FOR THE ASSESSMENT OF WHETHER THE PROVISION OF THE SERVICES REFERRED TO IN ARTICLE 35(1) IS SUBJECT TO MARKET CONDITIONS
CHAPTER III — PERFORMANCE TARGET SETTING
Article 7 -- Duration of the reference periods
2.In summary -- what and how
ANNEX VI -- LIST OF PERFORMANCE-RELATED DATA TO BE PROVIDED TO THE COMMISSION FOR MONITORING OF PERFORMANCE IN ACCORDANCE WITH ARTICLE 36(1) AND ARTICLE 37
Article 1 -- Objective and scope
GM3 SKPI Measurement of the effectiveness of safety management (EoSM) at ANSP level -- Interdependencies
Article 2 -- Definitions
Article 27 -- Traffic risk sharing mechanism
Article 8 -- Implementing rules
Article 11 -- Incentive schemes
Powers and recitals
Article 37 -- Monitoring and reporting
Article 15 -- Assessment of revised draft performance plans and targets and adoption of corrective measures
Note from the editor
Article 35 -- Terminal air navigation services and CNS, MET and AIS services and ATM data services subject to market conditions
Article 33 -- Collection of charges
Article 13 -- Safeguards
AMC4 Safety performance indicator (SPI) on automated safety data recording systems
Regulation (EU) 2019/317
CHAPTER VII — SPECIAL PROVISIONS
Article 10 -- Consultation of stakeholders
Annexes
Article 14 -- Entry into force
AMC1 SKPI Measurement of the effectiveness of safety management (EoSM) at ANSP level -- General
Article 41 -- Entry into force
Article 10 -- Performance plans
Article 19 -- Approval of the Network Performance Plan
Article 12 -- Adoption and submission of draft performance plans
ANNEX VII -- DETERMINED AND ACTUAL COSTS
Article 40 -- Repeal
Powers and recitals
Article 12 -- Supervision, monitoring and methods of impact assessment
Article 25 -- Calculation of unit rates
Article 32 -- Modulation of air navigation charges
I General
CHAPTER I — GENERAL PROVISIONS
4.Impact assessment(IA)
Appendices
.Appendix to SKPI -- Verification of the ANSP EoSM by the NSA/competent authority
Article 2 -- Definitions
CHAPTER IV — ADOPTION, ASSESSMENT AND REVISION OF PERFORMANCE PLANS
Article 8 -- Key performance indicators and indicators for monitoring
7.Quality of the document
CHAPTER V — FINANCING OF AIR NAVIGATION SERVICES, ESTABLISHMENT OF CHARGING ZONES, ESTABLISHMENT OF COST BASES FOR CHARGES AND TRANSPARENCY
Article 26 -- Inflation adjustment
Cover regulation
GM5 Safety performance indicators (SPIs) for the monitoring of separation minima infringements (SMIs) and runway incursions (RIs)
Article 5 -- Committee procedure
Article 29 -- Setting unit rates for charging zones
Article 11 -- Performance review
III Safety performance indicators (SPIs)
3.Amendments and rationale in detail
Article 1 -- Subject matter and scope
GM2 SKPI Measurement of the effectiveness of safety management (EoSM) at ANSP level -- General
Article 16 -- Adoption of performance plans
ANNEX VIII -- REQUIREMENTS FOR THE CALCULATION OF EN ROUTE AND TERMINAL SERVICE UNITS REFERRED TO IN ARTICLE 25
ANNEX XIII -- SPECIFIC REQUIREMENTS ON INCENTIVE SCHEMES REFERRED TO IN ARTICLE 11(3)
CHAPTER VIII — PROVISION OF INFORMATION, MONITORING, AND PUBLICATION OF INFORMATION
Article 23 -- Actual costs
Article 6 -- Coordination with the European Union Aviation Safety Agency
Article 34 -- Simplified charging scheme
ANNEX IV -- CRITERIA FOR THE ASSESSMENT OF PERFORMANCE PLANS AND TARGETS AT NATIONAL OR FUNCTIONAL AIRSPACE BLOCK LEVEL
GM7 Safety performance indicator (SPI) for monitoring ATFM over-deliveries
STATEMENT BY THE MEMBER STATES ON MILITARY ISSUES RELATED TO THE SINGLE EUROPEAN SKY
ANNEX XII -- ESSENTIAL ELEMENTS FOR THE CONSULTATIONS REFERRED TO IN ARTICLE 24(3) AND ARTICLE 30(1)
ANNEX II -- TEMPLATE FOR PERFORMANCE PLANS AT NATIONAL OR FUNCTIONAL AIRSPACE BLOCK LEVEL REFERRED TO IN ARTICLE 10(1)
1.About this Supporting Material
Article 13 -- Verification of completeness of draft performance plans
Article 6 -- Industry consultation body
CHAPTER IX — FINAL PROVISIONS
Cover regulation
AMC2 SKPI Measurement of the effectiveness of safety management (EoSM) at ANSP level
Article 18 -- Revision of performance targets during a reference period
Article 30 -- Transparency of unit rates
Article 5 -- Assistance by the Network Manager
II Effectiveness of the safety management KPI at ANSP level
Article 22 -- Establishment of the cost base for charges
Article 31 -- Calculation of charges
Incorporated amendments
Article 14 -- Assessment and revision of draft performance plans and targets
Article 4 -- Provision of information and facilitation of monitoring by air navigation service providers
COMMISSION IMPLEMENTING REGULATION (EU) 2019/317 of 11 February 2019 laying down a performance and charging scheme in the single European sky and repealing Implementing Regulations (EU) No 390/2013 and (EU) No 391/2013
Regulation (EC) No 549/2004