ED Decision 2023/013/R
REPAIR DESIGN APPROVAL BY A DESIGN ORGANISATION APPROVAL (DOA) HOLDER
(a) Approval by a DOA holder
The approval of repairs through the use of procedures agreed with EASA implies that the DOA holder issues the approval without EASA’s involvement. EASA will monitor the application of this procedure within the surveillance plan for the relevant organisation. When the organisation exercises this privilege, the repair release documentation should clearly show that the approval is issued on the basis of its privilege.
(b) Previously approved data for other applications
When it is intended to use previously approved data for other applications, it is expected that an appropriately approved design organisation has checked the applicability and effectiveness of this data. After damage identification, if a repair solution exists in the available approved data, and if the application of this solution to the identified damage remains justified by the previously approved repair design (structural justifications still valid, possible airworthiness limitations unchanged), the solution may be considered approved and may be used again.
(c) Temporary repairs
These are life-limited repairs to be removed and replaced by permanent repairs after a limited service period. These repairs should be classified under point 21L.A.203, and the service period should be defined when the temporary repair is approved.
(d) Fatigue and damage tolerance
An approved design issued before the fatigue- and damage-tolerance evaluation has been completed should specify the limited service period.
EASA guidance on DOA repair design approval privileges: documentation, reuse of approved data, temporary repair classification, and fatigue/damage-tolerance limits.