Navigate / EASA
GM1 21.A.139(d)(2)(ii) Production management system

ED Decision 2022/021/R

ASSESSMENT, AUDIT, AND CONTROL OF VENDOR AND SUBCONTRACTOR

For the purposes of AMC1Ā 21.A.139(d)(2)(ii) and AMC2Ā 21.A.139(d)(2)(ii), vendors and subcontractors are referred to as ā€˜suppliers’,whether they hold production organisation approvals (POAs) or not; audit and control are hereinafter referred to as ā€˜surveillance’. Implementing or significantly changing procedures to use an OP for supplier assessment and surveillance is a significant change to the quality system, and it requires approval in accordance with pointĀ 21.A.147.