ED Decision 2023/013/R
PHYSICAL INSPECTION AND CRITICAL DESIGN REVIEW
Depending upon the nature of the design change, prior to the approval of the flight conditions to support the issuance of a permit to fly, a physical inspection and a critical design review should be conducted with the applicant and the competent authority for conformity (production) under point 21L.B.242(a). The experience and outcome of this activity should be used by EASA to determine the need for a physical inspection and assessment of the first article of that changed product (first-article inspection) that may be conducted under point 21L.B.83(d) prior to the issuance of the supplemental type certificate for the change.
Loading collections...