Navigate / EASA
AMC 21.A.432C(b) Certification programme for a repair design approval

ED Decision 2025/016/R

Clarification of 21.A.432C(b)(1): the description of the repair should consist of:

— the pre- and post-repair configuration;

— a drawing or outline of the repair;

— a list of the detailed features;

— a description of the type and extent of the inspection; and

— an outline of the damage.

Clarification of 21.A.432C(b)(3): the identification of reinvestigations does not refer to the demonstration of compliance itself, but to the list of the affected certification specifications (CSs) and applicable environmental protection requirements, together with the means of compliance.