Navigate / EASA
AMC1 GH.OPS.100(b) Passenger handling — general requirements

ED Decision 2025/007/R

SAFETY RISK MITIGATION MEASURES FOR PASSENGERS ON THE APRON DURING BOARDING AND DISEMBARKATION

The walkways process should not be conducted:

(a) when the aircraft is being refuelled simultaneously with passenger boarding in the adjacent stand of the passenger boarding side;

(b) adverse weather conditions (thunderstorms, lightning, snow/ice, strong winds, heavy rain, fog, etc.) are anticipated or prevailing over the airport (the aerodrome procedures also apply for these conditions);

(c) an emergency situation is in progress.