Navigate / EASA

AMC E 750(b)  Starting tests

ED Decision 2007/015/R

The «declared drainage period» after a false start referred to in CS-E 750(b) is the minimum period necessary to allow surplus fuel to drain from the Engine prior to making a further attempt to start the Engine. The period is measured from the time at which the starter is switched off and/or the Engine fuel cock is closed during a false start.

[Amdt. No.: E/1]