Navigate / EASA

CS ACNS.C.PBN.101 Applicability

ED Decision 2019/011/R

(See AMC1 ACNS.C.PBN.101, GM1 ACNS.C.PBN.101 and GM2 ACNS.C.PBN.101)

 

(a)     Table 1 indicates the applicable airworthiness requirements to be met by the airborne RNP system installation in order to obtain airworthiness approval for the RNP specifications addressed in this CS. Applicants should select the target PBN specification from the left column and then follow the respective row to the right.

(b)     Subsection 2 provides also certification criteria for RNAV 10, RNAV 5, RNAV 2 and RNAV 1.

(c)      The RNP 0.3 specification is applicable to helicopters.

 

Table 1: PBN specifications — Mandatory and optional airworthiness requirements

 

Basic criteria

Supplementary criteria

PBN specification

Subsections
1 & 2

LNAV

Subsection
3

LNAV in final approach

Subsection
4

VNAV

Subsection
5

VNAV in final approach

Subsection
6

RNP AR

Subsection
7

Advanced-RNP

Subsection
8

RF

Subsection
9

FRT

Subsection
10

Parallel
offset

RNP 4

Required

 

 

 

 

 

 

Optional

Required

RNP 2

Required

 

 

 

 

 

 

Optional

Optional

RNP 1

Required

 

Optional

 

 

 

Optional

 

 

RNP 0.3

Required

 

Optional

 

 

 

Optional

 

 

RNP APCH

Required

Required

Optional

Required

 

 

Optional

 

 

RNP AR

Required

Required

Required

Required

Required

 

Required

 

 

A-RNP

Required

Required

Optional

Required

 

Required

Required

Optional

Required

 

Subsection 1: General applicability for performance-based lateral navigation

Subsection 2: Generic specifications for performance-based lateral navigation

Subsection 3: Supplementary specifications for lateral navigation in final approach

Subsection 4: Supplementary specifications for vertical navigation

Subsection 5: Supplementary specifications for vertical navigation in final approach

Subsection 5 includes criteria for RNP APCH approaches to LNAV/VNAV minima, either supported by barometric VNAV or by SBAS VNAV, as well as for RNP APCH approaches to LPV minima, which are supported by SBAS VNAV only. An applicant may opt to apply for approval of the RNP system to conduct operations to LNAV/VNAV minima, LPV minima or both.

Subsection 6: Supplementary specifications for RNP authorisation required (AR)

Subsection 6 includes criteria for RNP AR APCH and RNP AR departures. An applicant may opt to only apply for approval for RNP AR APCH.

Subsection 7: Supplementary specifications for applications for advanced RNP (A-RNP)

Subsection 8: Supplementary specifications supporting radius to fix (RF)

Subsection 9: Supplementary specifications supporting fixed radius transition (FRT)

Subsection 10: Supplementary specifications supporting parallel offset

[Issue: CS-ACNS/2]