AMC1 27.1045 Cooling
test procedures
ED Decision 2023/001/R
(a) Introduction
This AMC supplements FAA AC 27-1B, § AC 27.1045A and should be used in conjunction with that AC when demonstrating compliance with CS 27.1045.
(b) 30-minute power rating
(1) Explanation
This use of this rating may affect the cooling capabilities of the rotorcraft. This potential impact should be evaluated during the certification.
(2) Procedure
In the case of usage of a 30-minute power rating, AC 27.1045A b) should be completed as such:
Procedures. All of the policy material pertaining to this section remains in effect except that the engine fluid temperatures do not have to be stabilised. Paragraph AC 27.1045 currently lists three criteria for test completion: temperature stabilisation, flight test segment completion, or an operation limitation. With Amendment 27-23, a fourth criterion for test completion is:
— 5 minutes after the peak temperature is reached, the test can be considered to be complete, or
— the continuous time limit of the 30-minute power rating if the highest temperature recorded is not stabilised before.
[Amdt 27/10]