ED Decision 2023/013/R
FABRICATION OF PARTS FOR INSTALLATION
(a) The agreement of the competent authority on the fabrication of parts by the approved maintenance organisation should be formalised through the approval of a detailed procedure in the Maintenance Organisation Exposition (MOE). This AMC contains principles and conditions to be taken into account for the preparation of an acceptable procedure.
(b) Fabrication, inspection, assembly and test should be clearly within the technical and procedural capability of the organisation.
(c) All necessary data to fabricate the part should be approved either by the Agency or the type certificate (TC) holder, or Part 21 design organisation approval holder, or supplemental type certificate (STC) holder, or should be declared by the declarant of a declaration of design compliance or, if applicable for a minor change, by a Part 21 design organisation approval holder.
(d) Items that are fabricated by an organisation approved under Part-145 may only be used by that organisation in the course of overhaul, maintenance, modifications, or repair of aircraft or components, performing work at its own facilities. The permission to fabricate does not constitute approval for manufacture, or to supply externally, and the parts do not qualify for EASA Form 1 certification. This prohibition also applies to the bulk transfer of surplus inventory, in that locally fabricated parts are physically segregated and excluded from any delivery certification.
(e) Fabrication of parts, modification kits, etc., for onward supply and/or sale may not be conducted by an organisation that is approved under Part-145.
(f) The data specified in (c) may include repair procedures that involve the fabrication of parts. Where the data on such parts is sufficient to facilitate fabrication, the parts may be fabricated by an organisation that is approved under Part-145. Care should be taken to ensure that the data include details of part numbering, dimensions, materials, processes, and any special manufacturing techniques, special raw material specification and/or incoming inspection requirement, and that the approved organisation has the necessary capability to fabricate those parts. That capability should be defined by way of exposition content. Where special processes or inspection procedures are defined in the approved or declared (in accordance with Part 21 Light Subpart C) data, which are not available at the organisation, the organisation cannot fabricate the part unless the TC/STC holder or the declarant of a declaration of design compliance gives an approved alternative.
(g) Examples of fabrication within the scope of a Part-145 approval may include but are not limited to the following:
(1) fabrication of bushes, sleeves and shims;
(2) fabrication of secondary structural elements and skin panels;
(3) fabrication of control cables;
(4) fabrication of flexible and rigid pipes;
(5) fabrication of electrical cable looms and assemblies;
(6) formed or machined sheet metal panels for repairs.
All the above-mentioned fabricated parts should be in accordance with the data provided in the overhaul or repair manuals, modification schemes and service bulletins, drawings, or should be otherwise approved by the competent authority.
Note: It is not acceptable to fabricate any item to pattern unless an engineering drawing of the item is produced which includes any necessary fabrication process and which is acceptable to the competent authority.
(h) Where a TC holder or declarant of a declaration of design compliance, or an approved or declared (in accordance with Part 21 Light Subpart G) production organisation, or a production organisation using Part 21 Light Subpart R is prepared to make available complete data which is not referred to in the aircraft manuals or service bulletins but provides manufacturing drawings for items specified in parts lists, the fabrication of these items is not considered to be within the scope of an approval unless agreed otherwise by the competent authority in accordance with a procedure specified in the exposition.
(i) Inspection and identification
Any locally fabricated part should be subject to inspection before, separately, and preferably independently from any inspection of its installation. The inspection should establish full compliance with the relevant manufacturing data, and the part should be unambiguously identified as fit for use by stating conformity to the approved or declared (in accordance with Part 21 Light Subpart C) data. Adequate records should be maintained of all such fabrication processes including heat treatment and final inspections. All parts, except those that do not have enough space, should carry a part number which clearly relates it to the manufacturing/inspection data. In addition to the part’s number, the organisation’s identity should be marked on the part for traceability purposes.
AMC1 145.A.42(b)(iii) outlines conditions for Part-145 organisations to fabricate parts, including data approval, capability requirements, inspection, identification, and restrictions on external supply.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.