Navigate / EASA

GM2 ML.A.302  Aircraft maintenance programme

ED Decision 2020/002/R

The following table provides a summary of the provisions contained in ML.A.302 in relation to the content of the maintenance programme, its approval and its link with the AR:

 

OPTION 1

OPTION 2

Responsibility for developing the AMP

Contracted CAMO or CAO

Owner (if allowed under ML.A.201(f))

Approval/declaration of the maintenance programme

Approved by the CAMO or CAO, or none required in case of compliance with ML.A.302(e)

Declaration by the owner or none required in case of compliance with ML.A.302(e)

Basis for the maintenance programme

MIP (not applicable to rotorcraft and airships) or ICA issued by the DAH

Deviations from the DAH’s ICA

Deviations from the DAH’s instructions are justified. The CAMO/CAO keeps a record of the justifications and provides a copy of them to the owner.

Deviations do not need to be justified.

AMP annual review

In conjunction with the AR, by the AR staff or, if not performed in conjunction with the AR (e.g. in case of ARC extension), by the CAMO or CAO.