AMC1
ML.A.801(e) Aircraft certificate of release to service
ED
Decision 2020/002/R
(a) The aircraft CRS should contain one of the
following statements:
(1) ‘certifies that the work specified, except
as otherwise specified, was carried out in accordance with Part-ML, and in
respect to that work, the aircraft is considered ready for release to
service.’; or
(2) for a pilot-owner:
‘certifies
that the limited pilot-owner maintenance specified, except as otherwise
specified, was carried out in accordance with Part-ML, and in respect to that
work, the aircraft is considered ready for release to service.’.
(b) The CRS should relate to the task
specified in the DAH’s or operator’s instruction or the AMP which itself may
cross-refer to a DAH’s/operator’s instruction in a maintenance manual, service
bulletin, etc. This should indicate the revision status of the maintenance
instruction used.
(c) The CRS should include the date when the
maintenance took place relative to any life or overhaul limitation in terms of
date/flying hours/cycles/ landings etc. as appropriate.
(d) When extensive maintenance has been
carried out, it is acceptable for the CRS to summarise the maintenance as long
as there is a unique cross reference to the work pack containing full details
of the maintenance carried out. Dimensional information should be retained in
the work pack record.
(e) The person issuing the CRS should use his
or her normal signature except in the case where a computer release-to-service
system is used. In this latter case, the competent authority needs to be
satisfied that only this particular person may electronically issue the CRS.
One such method of compliance is the use of a magnetic or optical personal
card in conjunction with a personal identification number (PIN) known only to
the individual, which is keyed into the computer. A certification stamp is
optional.
(f) At the completion of all maintenance,
owners, certifying staff, operators and maintenance organisations should
ensure they have a clear, concise and legible record of the work performed.
(g) In the case of an ML.A.801(b)(2) CRS, the independent certifying staff should
retain all records necessary to prove that all requirements have been met for
the issuance of a CRS.
Aircraft release to service (CRS) for balloons requires a certification statement confirming maintenance was done per regulations. Pilot-owners have a specific statement. The CRS must reference the maintenance task, instruction revision, and date relative to limitations. Extensive maintenance can be summarized with a work pack reference. Electronic signatures require competent authority approval. Clear maintenance records are essential.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.
Loading collections...