Navigate / EASA
GM1 ADR.OPS.B.036(b)(4) Operations on specially prepared winter runways

ED Decision 2021/003/R

MAINTENANCE PROGRAMME

(a) The maintenance programme should include at least the following equipment:

(1) sand spreaders including heating and pre-wetting equipment; and

(2) chemical spreaders.

(b) The maintenance programme should include regular verification of the accuracy of distribution rates and temperature measurements for material spreaders.