GM5
ADR.OPS.B.070 Aerodrome works safety
ED Decision 2024/004/R
[applicable until 23 May 2025-ED
Decision 2017/017/R]
USE OF TEMPORARY RUNWAY MARKINGS
(a) Circumstances
may occur when it is not practicable to install permanent markings, for
example during runway resurfacing. In order to provide sufficient visual
guidance to aircraft, the following markings should be considered:
(1) runway
centre line;
(2) taxiway
centre line lead on/off;
(3) runway
edge line;
(4) runway
threshold; and
(5) touchdown
zone and aiming point markings.
(b) Centre
line and edge marking widths can be replaced by temporary markings of reduced
width from 0.9 m to 0.6 m, if required.
(c) Touchdown
zone and aiming point markings should be painted as soon as possible after the
resurface of the runway.
(d) Threshold
markings should be painted as soon as possible, using temporary materials
before making them permanent.
[applicable until 23 May 2025-ED
Decision 2017/017/R]
GM1 ADR.OPS.B.070(c)(5) Aerodrome works safety
[applicable
from 24 May 2025 – ED Decision 2024/004/R]
USE OF TEMPORARY RUNWAY
MARKINGS
(a) Circumstances may occur when it is not practicable to install
permanent markings, for example during runway resurfacing. To provide
sufficient visual guidance to aircraft, the following markings are considered:
(1) runway centre line;
(2) taxiway centre line lead on/off;
(3) runway edge line;
(4) runway threshold; and
(5) touchdown zone and aiming point markings.
(b) Centre line and edge marking widths can be replaced by
temporary markings of reduced width from 0.9 m to 0.6 m, if
required.
(c) Touchdown zone and aiming point markings are painted as soon
as possible after the resurface of the runway.
(d) Threshold markings are painted as soon as possible, using
temporary materials before making them permanent.
[applicable from 24 May 2025
– ED Decision 2024/004/R]
During aerodrome works like runway resurfacing, temporary runway markings (center, edge, taxiway lines, threshold, touchdown zones) ensure continued visual guidance for aircraft. Reduced width markings are acceptable. Touchdown and threshold markings should be prioritized and applied quickly, using temporary materials initially.