AMC1 ADR.OPS.B.035(a) Operations in winter conditions
ED Decision 2021/003/R
AERODROME SNOW PLAN
The aerodrome snow plan should reflect the exposure of the aerodrome to winter conditions and should include the following:
(a) the Snow Committee members and the person in charge of the winter operation, with a chain of command giving a breakdown in duties;
(b) methods of communication between aerodrome operations, air traffic services, and the MET provider;
(c) the equipment available for snow clearance and surface treatment. This should include equipment for ploughing, sweeping, and blowing snow and application of materials;
(d) priority of surfaces to be cleared, and clearance limits for aircraft using the aerodrome;
(e) collection of information for RCR and dissemination of this information;
(f) designated snow dumping or melting areas;
(g) an alerting system in order that sufficient warning is given to all bodies concerned;
(h) the manpower available, including staff for equipment maintenance arrangements for shifts, and call-out procedures;
(i) deployment of equipment and tactical approaches to be used;
(j) general principles to be followed in deciding when to close runways for snow clearance and designation of management personnel authorised to take the decision;
(k) methods of assessing and reporting the surface conditions; and
(l) criteria for the suspension of runway operations.
EASA regulations require aerodromes to have a comprehensive snow plan for winter operations. This plan must detail communication protocols, snow clearance equipment, surface priorities, RCR information dissemination, snow disposal areas, alerting systems, staffing, equipment deployment, runway closure procedures, surface condition assessment, and criteria for suspending operations, ensuring safe winter aviation.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.
Loading collections...