Navigate / EASA

AMC1 ADR.OPS.B.035(a) Operations in winter conditions

ED Decision 2021/003/R

AERODROME SNOW PLAN

The aerodrome snow plan should reflect the exposure of the aerodrome to winter conditions and should include the following:

(a)     the Snow Committee members and the person in charge of the winter operation, with a chain of command giving a breakdown in duties;

(b)     methods of communication between aerodrome operations, air traffic services, and the MET provider;

(c)      the equipment available for snow clearance and surface treatment. This should include equipment for ploughing, sweeping, and blowing snow and application of materials;

(d)     priority of surfaces to be cleared, and clearance limits for aircraft using the aerodrome;

(e)     collection of information for RCR and dissemination of this information;

(f)      designated snow dumping or melting areas;

(g)     an alerting system in order that sufficient warning is given to all bodies concerned;

(h)     the manpower available, including staff for equipment maintenance arrangements for shifts, and call-out procedures;

(i)      deployment of equipment and tactical approaches to be used;

(j)      general principles to be followed in deciding when to close runways for snow clearance and designation of management personnel authorised to take the decision;

(k)     methods of assessing and reporting the surface conditions; and

(l)      criteria for the suspension of runway operations.

Contact support