Navigate / EASA

FPD.OR.105 Management system

Commission Implementing Regulation (EU) 2020/469

In addition to point ATM/ANS.OR.B.005 of Annex III, the FPD provider shall establish and maintain a management system that includes control procedures for:

(a)     data acquisition;

(b)     flight procedure design in accordance with design criteria as set out in point FPD.TR.100;

(c)      flight procedure design documentation;

(d)     stakeholders consultation;

(e)     ground validation and, when appropriate, flight validation of flight procedure;

(f)      identification of tools, including configuration management and tools qualification, as necessary; and

(g)     maintenance and periodic review of the flight procedure(s), as applicable.