Navigate / EASA

GM2 CAT.OP.MPA.181 Fuel/energy scheme — fuel/energy planning and in-flight re-planning policy — aeroplanes

ED Decision 2022/005/R

BASIC FUEL SCHEME WITH VARIATIONS — STATISTICAL CONTINGENCY FUEL METHOD

As an example of statistical contingency fuel, the following statistical values of the deviation from the planned to the actual trip fuel provide appropriate statistical coverage:

(a)     99 % coverage plus 3 % of the trip fuel if the calculated flight time:

(1)     is less than 2 hours; or

(2)     is more than 2 hours and no fuel ERA aerodrome is available;

(b)     99 % coverage if the calculated flight time is more than 2 hours and a fuel ERA aerodrome is available; and

(c)      90 % coverage if:

(1)     the calculated flight time is more than 2 hours;

(2)     a fuel ERA aerodrome is available; and

(3)     at the destination aerodrome, two separate runways are available and usable, one of which is suitable for type B instrument approach operations, and the meteorological conditions are in accordance with point CAT.OP.MPA.182(e).

Contact support