Navigate / EASA
GM2 CAT.POL.MAB.110 Load control process

ED Decision 2025/008/R

LOADING SUPERVISION AND LOAD PLANNING

It is recommended that aircraft loading and unloading are supervised, if possible, by a different person from the one(s) responsible for load planning and the issuance of the mass and balance and load control documentation, the loading instructions and/or the NOTOC.

[applicable from 27 March 2028 — ED Decision 2025/008/R]