ED Decision 2023/007/R
HEMS OPERATIONS AT NIGHT WITHOUT NVIS
(a) A pre-surveyed HEMS operating site is a site that has been surveyed by day, is included in an operator’s operating site directory, and is re-surveyed on a regular basis as per AMC1 CAT.OP.MPA.105.
(b) For the purpose of taking off at night after a landing by day, the HEMS operating site need not be included in the operating site directory.
[applicable from 25 May 2026 — ED Decision 2023/007/R]
Loading collections...