ED Decision 2019/008/R
FINAL OPERATIONAL REPORT
An example of typical items for the final operational report is provided below:
(a) System description and classification of the EFB system:
(1) a general description of the EFB system and of the hardware and software applications.
(b) Software applications:
(1) a list of the type A EFB applications installed;
(2) a list of the type B EFB applications installed; and
(3) a list of the miscellaneous software applications installed.
(c) Hardware:
For portable EFBs used without installed resources, relevant information about or reference to:
(1) the EMI compliance demonstration;
(2) the lithium battery compliance demonstration;
(3) the depressurisation compliance demonstration; and
(4) details of the power source.
For portable EFBs served by installed resources:
(1) details of the airworthiness approval for the mounting device;
(2) a description of the placement of the EFB display;
(3) details of the use of installed resources;
(4) information on the EMI compliance demonstration;
(5) information on the lithium battery compliance demonstration;
(6) information on the depressurisation compliance demonstration;
(7) details of the power source;
(8) details of any data connectivity.
For installed EFBs:
(1) details of the airworthiness approval for installed equipment.
(d) Certification documentation:
(1) EFB limitations contained within the AFM;
(2) guidelines for EFB application developers; and
(3) guidelines for EFB system suppliers.
(e) Specific considerations for performance applications:
(1) details of performance data validation performed.
(f) Operational assessment:
(1) details of the EFB risk assessment performed;
(2) details of the human–machine interface (HMI) assessment performed for type B EFB applications;
(3) details of flight crew operating procedures:
(i) for using EFB systems with other flight crew compartment systems;
(ii) ensuring flight crew awareness of EFB software/database revisions;
(iii) to mitigate and/or control increased workload; and
(iv) describing flight crew responsibilities for performance and weight and balance calculations;
(4) details of proposed compliance monitoring oversight of the EFB system;
(5) details of EFB system security measures;
(6) details of EFB administration procedures, including provision of the EFB policy and procedures manual and EFB administrator qualifications;
(7) details of the procedure for electronic signatures;
(8) details of the system for routine EFB system maintenance;
(9) details of EFB training including flight crew training:
(i) initial training;
(ii) differences training; and
(iii) recurrent training;
(10) Report of the operational evaluation test:
(i) proposals for the initial retention of a paper backup;
(ii) proposals for the commencement of operations without any paper backup;
(11) EFB platform/hardware description;
(12) a description of each software application to be included in the assessment;
(13) a human factors assessment for the complete EFB system, human–machine interface (HMI), and all the software applications that covers:
(i) the flight crew workload in both single-pilot and multi-pilot aircraft;
(ii) the size, resolution, and legibility of symbols and text;
(iii) for navigation chart displays: access to desired charts, access to information within a chart, grouping of information, general layout, orientation (e.g. track-up, north-up), depiction of scale information.
Final operational report items for EFB approval: system description, software lists, hardware details, certification docs, performance validation, operational and human factors assessments.
* Summary by Aviation.Bot - Always consult the original document for the most accurate information.
Loading collections...