Regulation (EU) No 965/2012
The Agency shall prepare and submit to the Commission an annual report on the ramp inspection system containing at least the following information:
(a) status of the progress of the system;
(b) status of the inspections performed in the year;
(c) analysis of the inspection results with indication of the categories of findings;
(d) actions taken during the year;
(e) proposals for further improving the ramp inspection system; and
(f) annexes containing lists of inspections sorted out by State of operation, aircraft type, operator and ratios per item.
Loading collections...