ED Decision 2025/010/R
GENERAL
(a) The operator should track and monitor VEMS flights from take-off to landing.
(b) The operator should establish a detailed procedure describing how the aircraft tracking system is to be monitored, what actions are to be taken if a deviation or anomaly has been detected, and when those actions are to be taken.
OPERATIONAL PROCEDURE
(c) The operational procedure should take into account the following aspects:
(1) the outcome of the risk assessment conducted when the frequency of position reports was defined;
(2) the local environment of the intended operations; and
(3) the interface with the operatorโs emergency response plan.
(d) Aircraft tracking data should be recorded on the ground and retained for at least 48 hours. Following an accident or a serious incident subject to investigation, the data should be retained for at least 30 days, and the operator should provide a copy of this data without delay.
Loading collections...