AviationBot
Navigate / EASA / CONTINUING AIRWORTHINESS SEP 2025 / Annex Vd (Part-CAO) / APPENDICES TO AMC AND GM TO ANNEX Vd (Part-CAO) /

Appendix I to AMC1 CAO.B.045(c) and AMC1 CAO.B.055 -- EASA Form 613

EASA Form 613 is the Part-CAO approval recommendation report, structured in five parts covering general info, compliance audit, CAE review, findings, and recommendation.

Frequently Asked Questions

CAO.A.017.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

CAO.A.020.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

M.A.403(b) and ML.A.403(b).

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

EASA Form 613.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

Decision 2021/009/R.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

The address of the facility audited.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

N/R indicates that the item is applicable but it was not reviewed.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

M.A.201(c) and ML.A.201(c).

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

EASA Logo
Appendix I to AMC1 CAO.B.045(c) and AMC1 CAO.B.055 — EASA Form 613

ED Decision 2021/009/R



Part-CAO APPROVAL RECOMMENDATION REPORT EASA FORM 613

Part 1: General


Name of organisation:


Approval reference:


Requested approval rating:


EASA Form 3-CAO dated*:


Other approvals held (if applicable):


Address of facility audited:




Audit period: from

to


Date(s) of audit(s):


Audit reference(s):




Persons interviewed:




Competent authority inspector(s):



Competent authority office:

Signature(s):



Date of EASA Form 613 Part 1 completion:



*delete where applicable





Part-CAO APPROVAL RECOMMENDATION REPORT EASA FORM 613

Part 2: Part-CAO Compliance audit review

The five columns may be labelled and used as necessary to record the approval product line or facility, including the subcontractor’s, reviewed. Against each column used regarding the following Part-CAO points, please either tick (Ö) the box if satisfied with compliance or cross (X) the box if not satisfied with compliance, and specify the reference of the Part 4 finding next to the box; or enter N/A if an item is not applicable; or N/R if it is applicable but it was not reviewed.

Point

Subject







M.A.201(c)

Maintenance responsibility












ML.A.201(c)














M.A.403(b)

Aircraft defects












ML.A.403(b)














CAO.A.017

Means of compliance













CAO.A.020

Terms of approval













CAO.A.025

Combined airworthiness












exposition (see Part 3)











CAO.A.030

Facilities













CAO.A.035

Personnel requirements













CAO.A.040

Certifying staff













CAO.A.045

Airworthiness review staff













CAO.A.050

Components, equipment and












tools











CAO.A.055

Maintenance data and












work orders











CAO.A.060

Maintenance standards













CAO.A.065

Aircraft certificate of release












to service











CAO.A.070

Component certificate of












release to service











CAO.A.075

Continuing-airworthiness












management











CAO.A.080

Continuing-airworthiness












management data











CAO.A.085

Airworthiness review













CAO.A.090

Record-keeping













CAO.A.095

Privileges of the organisation













CAO.A.100

Quality system and












organisational review











CAO.A.105

Changes to the organisation













Competent authority inspector(s):


Signature(s):






Competent authority office:

Date of EASA Form 613 Part 2 completion:





Part-CAO APPROVAL RECOMMENDATION REPORT EASA FORM 613

Part 3: Compliance with the combined airworthiness exposition (CAE)

Please either tick (Ö) the box if satisfied with compliance; or cross (X) if not satisfied with compliance, and specify the reference of the Part 4 finding; or enter N/A if an item is not applicable; or N/R if it is applicable but it was not reviewed.

Part A

GENERAL DESCRIPTION

A.1


Statement by the accountable manager

A.2


General presentation of the organisation

A.3


Description and location of the facilities

A.4


Scope of work

A.5


Exposition amendments and changes to the organisation

A.6


Procedure for alternative means of compliance

A.7


Management personnel

A.8


Organisation chart

A.9


Manpower resources

A.10


List of certifying staff

A.11


List of staff responsible for the development and approval of the AMP

A.12


List of airworthiness review staff

A.13


List of staff responsible for the issuance of permits to fly

Part B

GENERAL PROCEDURES

B.1


Quality (or organisational review) system

B.2


Audit plan (or frequency and content of organisational review)

B.3


Monitoring of maintenance contracts

B.4


Qualification, assessment and training of staff

B.5


One-off certification authorisation

B.6


Limited certification authorisation

B.7


Subcontracting

B.8


Maintenance data and continuing airworthiness management data

B.9


Records management and retention

B.10


Carrying out the airworthiness review

B.11


Conformity with approved flight conditions

B.12


Issue of the permit to fly

Part C

MAINTENANCE PROCEDURES

C.1


Maintenance — general

C.2


Work order acceptance

C.3


Components, equipment, tools and material (supply, acceptance, segregation, storage, calibration, etc.)

C.4


Maintenance facility (selection, organisation, cleanliness and environmental limitations)

C.5


Maintenance accomplishment and maintenance standards

C.6


Prevention of maintenance error

C.7


Critical maintenance tasks and error-capturing method

C.8


Fabrication

C.9


Certifying staff responsibilities and maintenance release

C.10


Defects arising during maintenance

C.11


Maintenance away from approved location

C.12


Procedure for component maintenance under aircraft or engine rating

C.13


Procedure for maintenance on installed engine (or component) under engine (or component) rating

C.14


Special procedures (specialised tasks, non-destructive testing (NDT), engine running, etc.)

C.15


Issue of ARC under maintenance privilege

Part D

CONTINUING AIRWORTHINESS MANAGEMENT PROCEDURES

D.1


Continuing airworthiness management — general

D.2


MEL (and CDL) application

D.3


AMP development, control and periodic review

D.4


Airworthiness directives and other mandatory airworthiness requirements

D.5


Modifications and repairs

D.6


Pre-flight inspection

D.7


Defects

D.8


Establishment of contracts and work orders for the maintenance

D.9


Coordination of maintenance activities

D.10


Mass and balance statement

D.11


Issue of ARC or ARC recommendation

D.12


ARC extension

D.13


Maintenance check flights

Part E

SUPPORTING DOCUMENTS

E.1


Sample documents

E.2


List of subcontracted organisations

E.3


List of organisations contracted by the CAO

E.4


Aircraft technical log system (if applicable)

E.5


List of the currently approved alternative means of compliance

E.6


Copy of contracts for subcontracted continuing airworthiness tasks


CAE reference: CAE amendment:


Competent authority audit staff: Signature(s):


Competent authority office: Date of EASA Form 613 Part 3 completion:





Part-CAO APPROVAL RECOMMENDATION REPORT EASA FORM 613

Part 4: Findings regarding Part-CAO compliance status

Each level 1 and 2 finding should be recorded whether it has been rectified or not, and should be identified by a simple cross reference to the Part 2 requirement. All non-rectified findings should be copied in writing to the organisation for them to take the necessary corrective action.

Part

2 or 3

ref.

Audit reference(s):

Findings

L

e

v

e

l

Corrective action

Date

due

Date

closed

Reference


























Part-CAO APPROVAL RECOMMENDATION REPORT EASA FORM 613

Part 5: Part-CAO approval or continued approval or change recommendation*


Name of organisation:


Approval reference:


Audit reference(s):


The following Part-CAO terms of approval are recommended for this organisation:






Or, it is recommended that the Part-CAO terms of approval specified in EASA Form 3-CAO referenced ...................................................... should be continued.




Name of recommending competent authority inspector:


Signature of recommending competent authority inspector:


Competent authority office:


Date of recommendation:


EASA Form 613 review: Date:


*delete as appropriate



AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.