AviationBot
Navigate / EASA / BALLOON RULE BOOK SEP 2020 / Chapter 3 -- Initial airworthiness / CS-31TGB (initial issue) / SUBPART D -- DESIGN AND CONSTRUCTION /

CS 31TGB.68 Master switch arrangement

EASA Logo

CS 31TGB.68 Master switch arrangement

ED Decision 2013/011/R

(a)     There is a master switch arrangement to allow ready disconnection of electric power sources from the main bus.

(b)     The point of disconnection is adjacent to the sources controlled by the switch.

(c)      The master switch or its controls is installed so that the switch is easily discernible and accessible to the operator or occupant.

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.