CS 31GB.55 Rapid deflation means

EASA Logo

CS 31GB.55 Rapid deflation means

ED Decision 2011/012/R

(a)     The envelope must have means to allow for rapid deflation after landing. The system must be designed to minimise the possibility of inadvertent operation. If a system other than a manual system is used, the reliability of the system used must be substantiated.

(b)     If a balloon is equipped with a lateral rapid deflation means, a device must be installed to align the balloon during landing in order to turn the rapid deflation means into its designated position.