AviationBot
Navigate / EASA / BALLOON RULE BOOK SEP 2020 / Chapter 2 -- Continuing airworthiness / Part-ML / SECTION A -- TECHNICAL REQUIREMENTS / SUBPART C -- CONTINUING AIRWORTHINESS / ML.A.302 Aircraft maintenance programme /

AMC1 ML.A.302 Aircraft maintenance programme

EASA Logo

AMC1 ML.A.302  Aircraft maintenance programme

ED Decision 2020/002/R

(a)     The aircraft should only be maintained according to one maintenance programme at a given point in time. Where an owner wishes to change from one programme to another (e.g. from an AMP based on minimum inspection programme (MIP) to an AMP based on DAH’s data), certain additional maintenance may need to be carried out on the aircraft to implement this transition.

(b)     The maintenance programme may take the format of the standard template provided in AMC2 ML.A.302 (EASA Form AMP). This maintenance programme may include several aircraft registrations as long as the maintenance requirements for each registration are clearly identified.

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.