AviationBot
Navigate / EASA / BALLOON RULE BOOK SEP 2020 / Chapter 3 -- Initial airworthiness / CS-31TGB (initial issue) / SUBPART D -- DESIGN AND CONSTRUCTION / CS 31TGB.53 Tether system /

AMC1 31TGB.53(c) Tether system

EASA Logo

AMC1 31TGB.53(c) Tether system

ED Decision 2013/011/R

An automatic rapid deflation (See CS 31TGB.51) of the balloon in case it breaks away from its low mooring position or any other system that will prevent uncontrolled free flight is an acceptable risk mitigation.

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.