AviationBot
Navigate / EASA / BALLOON RULE BOOK SEP 2020 / Chapter 3 -- Initial airworthiness / CS-31HB (Amendment 1) / SUBPART D - DESIGN AND CONSTRUCTION / CS 31HB.49 Control systems /

AMC 31HB.49(e) Control systems

EASA Logo

AMC 31HB.49(e) Control systems

ED Decision 2009/005/R

The use of a signal warning device, which actuates at a temperature below the limiting safe temperature, is an acceptable means of compliance.

If the actuation of the signal warning device is of a non-recurring type, the Flight Manual should contain appropriate instructions as to the safe operation of the balloon after the actuation of the signal warning device.

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.