AviationBot
Navigate / EASA / ADDITIONAL AIRWORTHINESS SPECIFICATIONS OCT 2025 / ADDITIONAL AIRWORTHINESS SPECIFICATIONS FOR OPERATIONS / SUBPART B -- AEROPLANES / 26.303 Limit of Validity /

CS 26.303(a) and (c) Limit of validity

CS 26.303 details compliance methods for limit of validity, requiring WFD substantiation, ALS inclusion, maintenance action lists, and EASA-approved schedules, with additional means via AMC 20-20A.

Frequently Asked Questions

Compliance with points 26.303(a) and (c) of Part-26 is demonstrated by complying with CS 25.571 Amendment 19 or subsequent amendment, or by following the alternative means described in CS 26.303(a), (b), and (c).

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

The evaluation supporting the LOV must include substantiation that WFD will not occur in the aeroplane structure. An ALS must exist and include the LOV of each aeroplane structural configuration required by point 26.303, and each LOV must be supported by sufficient test evidence, analysis, and if available, service experience and teardown inspection results of high-time aeroplanes of similar structural design, accounting for differences in operating conditions and procedures.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

Where the certification basis of the aeroplane includes mixed requirements with respect to the CS/CFR Part 25/JAR 25.571 amendment status, the earliest amendment is used to define the compliance times.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

The list must include all maintenance actions upon which the LOV is dependent. It must identify existing mandated actions, existing actions that have not been mandated at the date of entry into force of the rule, and any new maintenance actions required.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

New maintenance actions must be established and, together with existing non-mandated actions, submitted to EASA for approval according to the schedule agreed by EASA prior to the approval of the LOV.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

For compliance times, refer to points 26.303(b) or 26.303(d) of Part-26, as applicable.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

Additional means of compliance are provided by Paragraph 8 of and Appendix 2 to AMC 20-20A.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

The ALS must exist and include the LOV of each aeroplane structural configuration required by point 26.303 of Part-26, and each LOV must be supported by sufficient test evidence, analysis, and if available, service experience and teardown inspection results.

* Aviation.Bot's Suggestion - Always consult the original regulation for confirmation

EASA Logo

CS 26.303(a) and (c) Limit of validity

ED Decision 2024/010/R

Compliance with points 26.303(a) and (c) of Part‑26 is demonstrated by complying with CS 25.571 Amendment 19, or subsequent amendment, or with the following:

(a) The evaluation supporting the LOV required by point 26.303 of Part‑26 includes a substantiation that WFD will not occur in the aeroplane structure. An ALS exists and includes the LOV of each aeroplane structural configuration required by point 26.303 of Part‑26 and each LOV is supported by sufficient test evidence, analysis and, if available, service experience and teardown inspection results of high-time aeroplanes of similar structural design, accounting for differences in operating conditions and procedures. Where the certification basis of the aeroplane includes mixed requirements with respect to the CS/CFR Part 25/JAR 25.571 amendment status, the earliest amendment is used to define the compliance times.

(b) A list is established of all the maintenance actions upon which the LOV is dependent. The list identifies existing mandated actions, existing actions that have not been mandated at the date of entry into force of the rule and any new maintenance actions required. A schedule for the development and submission of the maintenance actions to EASA is agreed by EASA prior to the approval of the LOV. For compliance times, refer to points 26.303(b) or 26.303(d) of Part‑26, as applicable. The new maintenance actions are established, and, together with the existing non-mandated actions, are submitted to EASA for approval according to the schedule agreed by EASA.

(c) Additional means of compliance are provided by Paragraph 8 of and Appendix 2 to AMC 20‑20A.

[Issue: 26/3]

[Issue: 26/5]

AI for Aviation Professionals

Aviation.Bot is an AI tool that assists you with aviation compliance.